EWN Compliance Advice: How do we implement API RP 1173 and PSMS?

Energy Worldnet (EWN) • July 19, 2018

Share this article

Have you heard of the API Recommended Practice 1173?

Do you know what goes into a Pipeline Safety Management System (PSMS)?

Operators around the country are scrambling to ensure that their pipeline systems have some sort of safety management system in place to make sure that they are in compliance with API RP 1173.

If you are wondering how and why this recommended practice came to be, you are not alone. In 2010 there was a pipeline accident in Marshall, MI where hundreds of thousands of gallons of oil spilled into surrounding lands and rivers. Due to this incident, the National Transportation Safety Board (NTSB) investigated and concluded that pipeline safety was the root cause. Because of this the NTSB tasked API with writing a recommended practice based on the findings of the NTSB investigation; thus, API RP 1173 Pipeline Safety Management System Requirement was born.

PSMS is a continuous improvement process that follows the Plan, Do, Check, Act model. That means that it is a cyclical process and it is never "complete." Improvement can always be made when it comes to safety.

API created the RP in this way because it aligns with the industry goal of zero incidents/accidents. Within this continuous improvement process, there are 10 key elements that the API outlines as critical to the pipeline safety management process.

Those 10 elements are:

  1. Leadership and Management Commitment
  2. Stakeholder Engagement
  3. Risk Management
  4. Operational Controls
  5. Incident Investigation, Evaluation and Lessons Learned
  6. Safety Assurance
  7. Management Review and Continuous Improvement
  8. Emergency Preparedness and Response
  9. Competence, Awareness and Training
  10. Documentation and Record Keeping

As we have seen before in this industry, Recommended Practices do not disappear. On the contrary, they tend to move toward regulation (i.e. The OQ Rule). As an ANSI designated standards document, API RP 1173 is the national standard for pipeline safety management systems in the US. Awareness and education of possible gaps are the first steps in the process of creating a successful PSMS program.

Do you have questions or want to find out more? Set up a meeting with one of our Compliance Specialists and they will walk you through the PSMS cycle and what you need to know to move forward.

Sources: pipelinesms.org

Recent Posts

By Kevin Speicher July 24, 2026
PHMSA just issued ADB-2026-06, an advisory bulletin reminding gas distribution operators of their existing obligations under 49 CFR Part 192, subpart P.
By Kevin Speicher July 22, 2026
On July 30, 2026 PHMSA is bringing the Gas Pipeline Advisory Committee & the Liquid Pipeline Advisory Committee together for a virtual meeting.
By Energy Worldnet (EWN) July 10, 2026
EWN's Regulatory Advisory Group breaks down RP 1173, PHMSA's new leadership, ECA rulemaking, multi-state OQ compliance, and PSMS for small operators.
By Kevin Speicher June 24, 2026
PHMSA's new approach of issuing 40+ targeted rulemakings instead of mega rules, and what the substantive changes mean for pipeline operators.
By Kevin Speicher June 24, 2026
PHMSA's Technical Pipeline Safety Standards Committee (GPAC) met on May 28, 2026, to work through the Safety of Gas Distribution Pipelines rule. Here's what happened and what operators need to know.
By Kevin Speicher June 19, 2026
Span of control refers to the practice of allowing an unqualified worker to perform a covered task while being directed and observed by a qualified person.
By Energy Worldnet (EWN) May 27, 2026
Former PHMSA leaders discuss PSMS, OQ, safety culture, contractor oversight, and the future of pipeline safety and compliance.
By Kevin Speicher April 30, 2026
PHMSA reinforcing sharper operational expectations: excavation damage remains one of the leading threats to pipeline safety.
Compliance Leadership Forum title slide on a dark blue screen with yellow and white text.
By Ashley Jesko February 26, 2026
Energy Worldnet (EWN) hosted the first-ever Compliance Leadership Forum (CLF)—a peer-to-peer space designed for candid, practical conversations about pipeline compliance and safety. Hosted by James Cross (Chief Experience Officer, EWN), the session brought together more than 150 years of combined experience from former state and federal regulators and industry leaders. Meet the panel Kevin Speicher, Senior Regulatory Advisor, EWN; former Chief of Pipeline Safety, New York State Department of Public Service Steve Allen, former Director of Pipeline Safety, State of Indiana; longtime PSMS advocate and former EWN executive Alan Mayberry, former PHMSA Associate Administrator, now with Jana and serving on boards focused on advanced risk and geohazards Jeff Wiese, former PHMSA Associate Administrator; former offshore operations leader; longtime safety management advocate The tone was clear from the start: no judgment, anonymous questions, and a focus on what operators can actually do next.
EWN PHMSA Update graphic with “Read More” on a dark teal background
By Kevin Speicher February 19, 2026
PHMSA has issued Advisory Bulletin ADB-2026-04, reminding gas pipeline, underground natural gas storage (UNGS), and LNG operators that incidents must be reported to the National Response Center (NRC) at the earliest practicable moment — and no later than one hour after confirmed discovery.
Show More